The Participant Rolling Outage Plan (PROP) advises the System Operator and the public of Northpower’s planned response to a declared ‘Supply Shortage Declaration’ if issued by the System Operator.

A foreseeable scenario where this plan might be called into effect would be during a low inflow spring and/or a drought summer, when low water levels in the main hydro lakes seriously reduce electricity generation capacity and action needs to be taken in order to conserve energy.

For further information please download: