| Price Plan | Applicable charges excluding metering | Tariff Code | Availability per day | Total line charge from 1/04/12 | Total line charge from 1/04/13 | Transmission portion of total line charge from 1/04/2013 | |
|---|---|---|---|---|---|---|---|
| ND9 (Code 9) | Monthly Customer charge | D | 24 hours | $120.00 | $120.00 | $/month | 0% |
| Demand-based | Anytime Demand Charge | 09AD | $5.55 | $5.80 | $/kVA/month | 40% | |
| (72 ICP's) | Shoulder Demand Charge | 09SD | $8.00 | $8.20 | $/kVA/month | 57% | |
| Reactive Power charge | 09RP | $2.41 | $1.62 | $/excess kVAr/month | 100% | ||
| ND10 (Code 10) | Daily Customer charge | J | 24 hours | 260.00 | 260.00 | cents/day | 0% |
| Consumption | HH commercial | 31 | 10.30 | 10.90 | cents/kWh | 27% | |
| Based (72 ICP's) | Reactive Power charge | 31RP | 3.00 | 3.00 | cents/excess kVArh | 100% |
Methodology for ND9 “Code 9” charges
- The Anytime Demand is the highest half-hour demand at any time between 1 April and 31 March, with a minimum chargeable demand of 150kVA.
- The Shoulder Demand is the average of the six highest daily half-hour demands from 0700-1000 and 1700-2130 from 1 May to 30 September, with a minimum chargeable demand of 150kVA.
- Both the Anytime and Shoulder Demand Charges are charged in every month of the year. Any increases in demand during the year are applied to the entire year.
- The Reactive Power Charge is currently assessed on the basis of a 0.95 lagging power factor coincident with the highest half-hour demand each month.
Methodology for ND10 “Code 10” charges
- The ND10 Price Plan is an alternative for ICP’s with half-hour metering where the ND9 Price Plan is unsuitable.
- The Reactive Power Charge is assessed over an entire month on the basis of any net excess reactive power above the threshold of an average 0.95 power factor.
Note: ND 9 and ND10 are only available at ICP’s with half-hour metering. Switches to or from ND9 and ND10 can only be made on the first day of a month.